Sprint 90 — AX WORKS by TROE
TROE / AX WORKS / Sprint 90

Sprint 90 One workflow running in 90 days

Pick one workflow and make it actually run within 90 days. This is the core AX WORKS product.

In one line

Sprint 90 is the core AX WORKS product: pick one workflow, get it actually running within 90 days, and complete the handover so the team can run it on its own. During the run we work alongside the team so it takes on the AI PM and AX PM roles itself (priorities, evaluation and release decisions, running the approval gate, reporting).

When

When you need it

  • You have a design, but no workflow is actually running yet
  • Pilots stop at the demo and never reach the people doing the work
  • You want your team to build with us and learn, not have it "built for you"
How

How it works

  1. Choose the workflow and agree on criteriaFirst we set the one target workflow, the success criteria, and the points where a person approves.
  2. Design and buildWe start small, and in every sprint the people doing the work use it themselves and fix it.
  3. VerifyWe measure time, quality, and risk together, with rules that let us stop immediately if a problem appears.
  4. Launch and hand overWe hand over operating documents and review methods so the team can run it on its own.

Duration, scope, and cost are discussed in consultation.

Work items

Roles we cover during the run

Your team takes over the planning, evaluation, and reporting roles the run needs by doing them alongside us.

  • AI PM role: Sprint priorities, the evaluation set and release criteria, and the risk log.
  • AX PM role: Reporting to the business and executives, aligning stakeholders, and running the approval gate.
  • Handover: We don't build it for you. We work alongside your team so its owners gradually take on both roles.
Result

What you keep

One workflow that actually runs inside your team, measurement records, and operating documents. It becomes the first case and the reference point for expanding later.

FAQ

Frequently asked questions

What does Sprint 90 do?

It picks one workflow and makes it actually run within 90 days.

Does TROE build it for us?

No. Instead of building it for you, your team builds it with us and learns along the way. In every sprint, the people doing the work use it themselves and fix it.

What happens if something goes wrong?

We measure time, quality, and risk together, and set rules up front so the workflow can be stopped immediately if a problem appears.

Can we start without an AI PM or AX PM on our side?

You can start without one, but you need to name the person who will own the workflow after launch. Within the sprint we work alongside that person so they do the planning, evaluation, and reporting themselves.

Where should our team start?

Check where you stand with the 3-minute assessment (in Korean), or send us a message and we will get back to you directly.